Samsung VP-D310 Specifiche Pagina 405

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 503
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 404
OWNER’S GUIDE  CONDITIONERS, EPAD2/CPAD2 | 16405
When you click FILL, DS-7 will prompt you to press the black button on the EPAD2 module. Use a paperclip
or thin pencil lead to do that, and the module will be addressed to this slot number, and it will show up here
on the Setup screen. Use the SET CH. button on the far right to congure the eight channels of this module.
Now connect the next EPAD2 module and repeat these steps, moving down to the next empty amplier but-
ton, and so on, until all EPAD2 modules have been installed.
Be sure to plug the terminator into the last EPAD2 module (even if there is only one EPAD2 module).
xPAD2 Series Calibration Information
All DEWETRON modules are calibrated at 25°C after a warmup time of 30 minutes and meet their speci-
cations when leaving the factory. The time interval for recalibration depends on environmental conditions.
Typically, the calibration should be checked once a year.
Calibration certicates are available from DEWETRON as an option. DEWETRON offers several types:
NIST traceable DEWETRON calibration certicate (USA CAL LAB only)
ISO traceable DEWETRON certicate (European CAL LAB only)
Calibration certicate according to ÖKD (equivalent to DKD)
This manual contains no calibration information. There are separate resources optionally available for
MDAQ series modules for automated calibration under Met/CAL®. The CAL-KIT contains the required
cables, software and instructions that you need to add to your own calibration lab. It does not include a
calibrator or volt meter.
Vedere la pagina 404
1 2 ... 400 401 402 403 404 405 406 407 408 409 410 ... 502 503

Commenti su questo manuale

Nessun commento